Garfield Primary School - South Wimbledon

  • Mosaic made with Year 5 and 6 children for new school building.
  • These children were able to practice and gain knowledge of the indirect and direct method of making mosaics.
  • The mosaic shows the park next to the school with the River Wandle running through it.
  • The design came together after working closely with two groups of 10 children (Yr.5 & 6) for a design workshop.
  • Whole school involved in researching the local environment and making drawings & paper mosaics.
PREV PROJECT NEXT PROJECT
HOME