 |
| |
Garfield
Primary School - South Wimbledon |
 |
- Mosaic made with Year 5 and 6 children for new school building.
- These children were able to practice
and gain knowledge of the indirect and direct method of making mosaics.
- The mosaic shows the park next to the
school with the River Wandle running through it.
- The design came together after working closely
with two groups of 10 children (Yr.5 & 6) for a design workshop.
- Whole school involved in researching the
local environment and making drawings & paper mosaics.
|
| |
|
| HOME |
| |